31 Best Construction Industry Project Management Software 2026: Full List


Disclosure: We may earn commissions if you shop through the links below.

Last Updated: January 8, 2026

The table below shows a quick price comparison of all the construction industry project management software solutions that we’ve researched:

 

Company nameStarting priceFree trial length
Notion$014 day
Asana$030 day
Smartsheet$930 day
ClickUp$0No trial available
monday.com$014 day
Wrike$014 day
Quickbase$3530 day
GanttPRO$7.9914 day
TeamGantt$07 day
Resource Guru$4.1630 day
Zoho Projects$010 day
Avaza$0No trial available
Mission Control$3914 day
ProjectManager$1330 day
Worksection$014 day
Stackby$0No trial available
Workzone$24No trial available
OracleNot statedNo trial available
Spreadsheet.com$030 day
Priority Matrix$014 day
ProProfs Project$014 day
Ganttic$014 day
PlaniswareNot stated14 day
LinkdNot statedNo trial available
Orangescrum$015 day
OpenProject$014 day
Fieldwire$0No trial available
Fluix$50No trial available
Buildertrend$199No trial available
ProcureNot statedNo trial available
Striven$07 day

*The prices in the table above (where available) come directly from each company’s website and were accurate at the time of writing. Since then, those prices may have changed.

We’ve listed the results of our project management software research and the features of each company’s product in a bit more detail below. You’ll be able to see the benefits of their service and some general information about the company as well.

*companies are ranked in no particular order.

Sections

Toggle
  • 1. Notion
  • 2. Asana
  • 3. Smartsheet
  • 4. ClickUp
  • 5. Monday.com
  • 6. Wrike
  • 7. Quickbase
  • 8. GanttPRO
  • 9. TeamGantt
  • 10. Resource Guru
  • 11. Zoho Projects
  • 12. Avaza
  • 13. Mission Control
  • 14. ProjectManager
  • 15. Worksection
  • 16. Stackby
  • 17. Workzone
  • 18. Oracle Project Management
  • 19. Spreadsheetcom
  • 20. Priority Matrix
  • 21. ProProfs
  • 22. Ganttic
  • 23. Planisware
  • 24. Linkd
  • 25. Orangescrum
  • 26. OpenProject
  • 27. Fieldwire
  • 28. Fluix
  • 29. Buildertrend
  • 30. Procore
  • 31. Striven

1. Notion

Notion construction project management software

  • They offer a range of software to manage projects with a variety of templates designed specifically for the construction industry.
  • The construction templates can aid you with managing your project timelines, tracking your tasks and organizing your teams.
  • It can assist you in keeping your projects on schedule with a range of tools such as task boards, trackers and meeting notes.
  • The templates can be edited, changed and updated to match your requirements.
  • You can automate and streamline processes and workflows to reduce admin and manual tasks.
  • The software provides you with a clear picture of your project and enables you to monitor timelines and track dependencies and deadlines.
  • You can manage your projects and data effectively using priority labels, tags and more to help you sort and report on your information.
  • They provide a dashboard facility that you can customize to display the information you need in charts and reports.
  • You can integrate it with apps and software so that your data is synchronized in one place.
  • They offer a free plan designed for individuals as well as a 14-day free trial of the software.

Website: https://www.notion.com/templates/category/construction

2. Asana

Asana construction project management software

  • Offers project management software with construction templates to support the construction industry.
  • It is designed to assist you in overseeing your project planning, managing your staff, coordinating your deliveries and keeping your projects on track.
  • You can streamline your projects using pre-designed templates and workflows that can be adapted to your needs.
  • It brings together all your project information in one place so that all your team can access it whether they are in the office or working remotely on site.
  • The software enables you to track your projects and coordinate several projects at once.
  • It can support you in creating project estimations, planning project resources and aligning expectations.
  • They also offer time tracking tools so that you can account for the time that is spent on each project or task.
  • You can monitor your projects in a variety of ways including using Gantt charts, Kanban boards, timelines, lists and calendars.
  • It can be integrated with over 260 software and apps so that you can have all the tools you need in the same place.
  • A free plan is available that allows collaboration with up to 10 teammates and they also offer a free 30-day trial.

Website: https://asana.com/templates/industry/construction

3. Smartsheet

Smartsheet construction project management software

  • They offer a project management platform that is more people-centric and they provide tailored solutions which include a construction version.
  • It is designed to bring together your people, information and processes on a single platform to aid the delivery of construction projects on time and within budget.
  • You can streamline and automate your construction project lifecycle to make efficiencies and save costs.
  • The software can aid you in gaining visibility of your projects and transparency for your teams.
  • You can monitor your projects and see any dependencies and potential risks so you can make informed decisions.
  • It can aid you with setting priorities and making decisions about staffing and scheduling your time.
  • The software can assist your field operations with improved documentation, issue capture, resource management and supporting collaboration between your teams, vendors and clients.
  • You can access a dashboard and key metrics about your projects in real-time to monitor progress across your portfolio.
  • It can be connected with a wide range of other platforms and software that you use so you can unify your information in one platform.
  • You can access a 30-day free trial of the software or a demo to learn more about it.

Website: https://www.smartsheet.com/solutions/construction

4. ClickUp

ClickUp construction project management software

  • Offers dedicated project management software for construction companies that can help you to plan, manage and track construction projects.
  • It is designed as an all-in-one solution to manage your projects from conception to delivery.
  • The software enables you to adapt the views so you can manage single or multiple projects whilst standardizing your project management approach.
  • It supports you in collaborating with your team to plan and organize your projects and tasks and ensure they are delivered on time.
  • The software offers AI technology and automation to enable you to streamline your processes and workflows to make your operations more efficient.
  • You can create tasks and subtasks to manage your activities in more manageable chunks that can be scheduled and prioritized.
  • The software enables you to work with clients by inviting them to contribute and share attachments with them.
  • It can also track time, manage contractors, send updates, create estimates and purchase orders to support project delivery.
  • You can access a dashboard that can display your progress in real-time and produce reports on your performance.
  • A free plan is available for personal use only but this could be used to trial the software.

Website: https://clickup.com/teams/construction

5. Monday.com

Monday.com construction CRM

  • They offer construction management software that helps you to manage your projects from the ground up.
  • The software enables your teams to work seamlessly together regardless of whether they are in the field or the office.
  • It supports you in staying informed with the instant sharing of files, images and updates as well as feedback.
  • You can set up your projects in minutes using one of the customizable construction templates.
  • The software enables you to track your projects effectively including timelines, budgets and resources.
  • It allows you to have all your documents and communications in one place so that everyone can see the latest versions.
  • The software can also send automatic reminders to keep you on track, store your documents so you have easy shared access from anywhere, and offer an offline mode.
  • It can be connected with your existing tools and over 200 integrations to support you in creating more efficient operating systems.
  • You can create a range of reports and have them automatically sent to you such as progress reports, project financials and more which can aid decision making.
  • They offer a free plan for two users and also offer a 14-day free trial of the software.

Website: https://monday.com/construction

6. Wrike

Wrike construction project management software

  • Offers construction project management software that is designed as an all-in-one platform.
  • They provide a range of project management tools that can help you save time and money as well as excel in your projects.
  • It supports you in building your projects from the ground up and then managing them throughout the build.
  • The software can aid you by streamlining tasks, processes and workflows with automation to reduce repetitive and admin tasks.
  • They provide an overview of your projects in a Gantt chart format that is interactive and shows your project timelines.
  • You can break your projects down into manageable tasks to enable you to track them and see any dependencies and risks.
  • They provide tools to monitor your budgets, track your time and optimize your resources.
  • You can track billable hours through individual timesheets that record the work that each person has completed.
  • The software provides real-time reports on your portfolio and project performance including budgets and time spent.
  • You can access a free plan that caters for teams with some limitations and they also offer a 14-day free trial.

Website: https://www.wrike.com/industries/construction/

7. Quickbase

Quickbase construction project management software

  • They offer construction management solutions that can simplify project management.
  • It is designed to help you manage your workflows more effectively, improve communication and deliver projects on time.
  • They provide a range of pre-built apps that can support the construction industry.
  • The software can manage your preconstruction phases with planning, bidding, estimating and timelines.
  • It can track the progress of your projects to ensure that everyone is aligned and that delivery stays on track.
  • You can manage your resources through the software so you can optimize your labor, materials and equipment as well as make data-driven decisions.
  • It can support you in monitoring your budgets and costs in real time to keep your financials on track.
  • The software can also assist with ensuring compliance with safety and quality management through the tracking of inspections, incidents and corrective actions.
  • They provide reports that can provide insights on your projects and monitor performance which can help with decision making.
  • A free trial for 30 days is available so you can see what the software has to offer.

Website: https://www.quickbase.com/solutions/construction-industry

8. GanttPRO

GanttPRO construction project management software

  • Offers professional construction project management software that can streamline your workflow and unite your office and field teams.
  • It is designed to provide you with a single source of truth that can coordinate all your processes and support your teams.
  • The software can aid you in planning and managing your projects and tasks more effectively in one place.
  • It enables you to access project information and documents as well as being able to add comments and receive notifications.
  • You can streamline your projects by being able to manage them in one place from concept to closure.
  • They allow you to visualize your projects and track progress in Gantt charts so that you can stay on track.
  • You can also access resource management, time management and budget management functions to manage your projects more effectively.
  • The software can be integrated with apps and other software to enable you to synchronize your data.
  • It provides reporting and detailed analytics that can give you visibility of your projects and timelines.
  • They offer a 14-day free trial of the software to enable you to see first-hand what it can do.

Website: https://ganttpro.com/construction/

9. TeamGantt

TeamGantt construction project management software

  • They offer construction project management software that can aid you in meeting deadlines and streamline your communications.
  • It can support you in planning and creating construction schedules using completion dates and tracking.
  • The software can help you spot where tasks are compared to your timeline so you can see any issues or risks.
  • You can easily share your plans with your team and it enables you to view updates, comments and documents.
  • The software is capable of managing multiple projects and you can monitor your projects on Gantt charts, Kanban boards, calendar view and list view.
  • You can track time in the software so that you can allocate time to projects and see what your team are working on.
  • They allow you to create unlimited guest accounts to enable you to collaborate and share information with clients and partners.
  • It offers one-click reports to provide you with quick and easy visibility of your projects and to see how they are performing.
  • They offer a mobile app that enables your teams to access the software wherever they are including on-site.
  • You can access a free plan which includes one manager and two collaborators on a single project and a maximum of 60 tasks, and they also offer a 7-day free trial.

Website: https://www.teamgantt.com/uses/construction-planning-software

10. Resource Guru

Resource Guru construction project management software

  • Offers construction resource management software that aids you in managing your workforce and maximizing your productivity.
  • The software provides you with a team calendar that enables you to see what is coming up next visually and keeps you up to date.
  • It allows you to manage your resources and identify any scheduling conflicts and issues so that you can address them.
  • You can build your project plans and schedules using real-time data so that you can minimize any possible project delays.
  • The software can aid you in managing your equipment and people including contractors in their dynamic resource directory.
  • You can view how your resources are being used and use reports to optimize their utilization.
  • It can support you with clear communication with daily email schedules and personalized dashboards.
  • They offer a range of reports that can give you insight into your projects such as key metrics and performance.
  • You can integrate the software with other software and apps so that they can synchronize your data.
  • They offer a 30-day free trial of the software so that you can explore what the software has to offer.

Website: https://resourceguruapp.com/industries/construction

11. Zoho Projects

Zoho Projects construction project management software

  • Offers dedicated construction project management software that can assist with coordinating your plans, people and resources.
  • They provide comprehensive project management software that is designed to help you streamline your operations and building projects.
  • It aims to help you simplify your projects and build in factors including delays for procurement, deliveries and approval, dependency issues and rescheduling.
  • The software can aid you in managing your resources by managing availability, assigning staff and checking utilization.
  • It can store all of your project information and documents in one place that is easy to access, share and control.
  • You can utilize the software to improve communications as it can help you communicate directly with your workforce, provide access to the information they need, make announcements and share information.
  • It supports your billing and spending management with the ability to create base pricing, select billing methods, track spending in real-time and alerts for exceeding budget.
  • You can also manage your equipment, machinery and materials through the software and ensure that they are in the right place as well as have a digital inventory system.
  • The software is available on a mobile app so you can stay connected wherever you are and it can be integrated with a wide range of apps and software.
  • A free plan is available for up to five users and three projects, and they also offer a free 10-day trial on their paid plans.

Website: https://www.zoho.com/projects/construction-project-management.html

12. Avaza

Avaza construction project management software

  • Offers an all-in-one project management software for the architecture and construction industry that aids with design, construction and management in one platform.
  • It can assist with the whole lifecycle starting with streamlining your quoting process and follow-up processes so that no potential client is lost.
  • The software helps with organizing all of your tasks and creating effective workflows that can be more efficient.
  • It can improve collaboration between your team, clients, subcontractors and other third parties to keep all parties informed.
  • You can simplify your file management in the software and integrate it with file management apps to improve finding and sharing documents.
  • The software can assist you in managing and monitoring time and expenses so that you track your budget more effectively and stay within budget.
  • It can aid you in streamlining your resource scheduling and eliminate underutilization through optimizing your resource scheduling.
  • The software can assist you in producing precise invoices with an adaptive invoicing system that can manage time-material and fixed-amount milestone-based projects.
  • You can access a range of reports to help you monitor your projects, your progress and spending which you can create or schedule as automated reports.
  • Offers a free plan but it has limited functionality compared to the paid plans.

Website: https://www.avaza.com/architecture-construction-software

13. Mission Control

Mission Control construction project management software

  • They offer construction projection management software that can help streamline and automate your processes.
  • It can simplify all your processes and management including planning, resources and budgeting.
  • The software can aid you in ensuring that your project is delivered on time, within scope and on budget.
  • It can assist you in managing all your stakeholders including suppliers, contractors and regulatory bodies.
  • You can schedule your project activities and ensure that milestones are met and efficiently resourced.
  • The software provides resource management facilities to track and allocate labor, equipment and materials.
  • It supports collaboration across teams and externally as well as providing a centralized repository for all project documents.
  • The software can aid with logging time and tracking hours across multiple projects and allocate them to the right projects for accurate billing and reporting.
  • You can access a PMO dashboard to track project performance financials including billing and cost rates.
  • They offer a free 14-day trial of the software to enable you to see what the software can do.

Website: https://aprika.com/fundamental_library/what-is-construction-project-management-software/

14. ProjectManager

ProjectManager construction project management software

  • Offers construction project management software that helps you to manage your projects and field teams more effectively.
  • It is designed to assist you with planning, scheduling and executing your construction projects from beginning to end.
  • The software is easy to use and can be accessed in the office or on-site using the mobile app so you can always be connected.
  • They provide a range of project management tools which include Gantt charts, task lists, timelines, project calendars, timesheets and dashboards.
  • You can create construction schedules, assign tasks and monitor their progress in the software.
  • It enables you to identify and resolve issues in one place as it includes budget and expense management.
  • They offer unlimited file storage so you can store all your project documents so that they are easily accessible.
  • You can integrate it with over 1,000 apps that can support your operational delivery and create efficiencies.
  • They offer a customizable dashboard and in-depth reports to help you monitor your progress and performance.
  • A free 30-day trial of the software is available so that you can sample what it can offer.

Website: https://www.projectmanager.com/industries/construction-project-management

15. Worksection

Worksection construction project management software

  • They offer project management software for the construction industry that is a flexible and efficient tool.
  • It is suitable for managing complex and long-term projects with multiple subcontractors.
  • You can set up the software easily and it has a user-friendly interface that is simple for all your team to use.
  • The software can enhance collaboration between team members, clients and subcontractors.
  • You can view your projects on Gantt charts and Kanban boards to monitor progress, check that they are on schedule and view any dependencies.
  • They provide a range of planning tools which include timelines, milestones, statuses, budgets and resources.
  • It can aid you in managing your resources and ensuring optimum utilization through tools to assign tasks to the right team members and view their workloads.
  • You can track your expenses and budgets in the software and it includes alerts for overspending or when you are close to exceeding your budget.
  • It can also streamline regular tasks, integrate with other apps and is available on the mobile app so you can connect to it on the go.
  • A free plan is available for personal projects and they offer a free 14-day trial of their paid plans.

Website: https://worksection.com/en/for-construction.html

16. Stackby

Stackby construction project management software

  • Offers project management software with a construction template to support those in the construction industry to manage projects more efficiently.
  • They can aid with managing tasks, phases and assets as well as help you to visualize your tasks and see them by status.
  • You can customize the fields to meet your project requirements such as material costs, equipment rentals and vendor details.
  • It provides a construction project calendar that allows you to track the start and end dates of your tasks to keep them on track.
  • You can schedule your tasks and allocate resources to them whilst monitoring their progress and budget.
  • It can help you to view progress, identify any possible issues and aid with making informed decisions.
  • The software can enhance your communications and collaboration with team members, contractors and stakeholders.
  • You can store all your project documents in the software so that all project information is in one place.
  • It can generate reports that enable you to monitor your progress, identify any roadblocks and make data-driven decisions.
  • Offers a free plan that is suitable for individuals and small teams but it has limited features or usage.

Website: https://stackby.com/templates/construction-project-management

17. Workzone

Workzone construction project management software

  • They offer construction project management software that aids you in staying organized and more productive.
  • They claim to be rated number one in project management through their rates on several review platforms.
  • The software caters for construction teams of all sizes and project types.
  • It provides cross-project dashboards that enable you to review your projects quickly and easily as well as allow you to change priorities.
  • The software enables you to split your tasks and share them with your team to work collaboratively on the project.
  • It automatically produces individual to-do lists to aid each person in organizing their work.
  • You can streamline your processes to enable you to create efficiencies and improve approvals.
  • They provide reporting facilities to deliver insights about your projects and progress and can identify risks or issues.
  • Their plans include unlimited training, one-to-one coaching and support.
  • You can request a demo of the software and if you like it you may be offered a Test Drive which is a hand-held trial.

Website: https://www.workzone.com/industries/construction-project-management/

18. Oracle Project Management

Oracle construction project management software

  • They offer construction management software that can manage your projects and connect your teams, processes and data.
  • It is designed to assist you in improving your control, increase productivity and give you greater insights.
  • The software helps you to schedule your projects and ensure you have the right resources at the right time.
  • It enables you to plan schedule and resource your projects whilst including field task management details.
  • You can align your office and the field teams through the software and enable them to share the same information and collaborate.
  • The software can store all of your project documentation to make it easier to access and find as well as having auditable trails.
  • You can streamline your process and create automation which can include compliance management, invoicing and payments.
  • It can also automate, track and manage budgets as well as aid you in forecasting.
  • The software can also manage capital projects and assets which can include tracking costs and assets.
  • They offer a demo of the software so that you can learn more about it.

Website: https://www.oracle.com/construction-engineering/construction-management-software/

19. Spreadsheetcom

Spreadsheet.com construction project management software

  • Offers workspace software that can cater for small to multi-million dollar construction projects.
  • They offer four plans that are tailored to meet the needs of different organization sizes.
  • The software is easy to use and it combines the different aspects of spreadsheets, databases and project management systems into one.
  • They provide workspaces that enable you to collaborate with others and organize your work in one place.
  • It allows you to visualize your projects in Gantt charts and you can also filter and sort your data into task lists.
  • You can automate your processes such as communications including sending emails and notifications which can save time.
  • The software supports your team in collaborating in real-time using messaging as well as sending updates.
  • It offers storage facilities so you can store all your project information in one place for all your staff to access.
  • The software can be connected to third-party software and apps to enable you to integrate your data.
  • A free plan is available for a single license and workspace but they also offer a free 30-day trial of the software.

Website: https://support.spreadsheet.com/hc/en-us/articles/360029504972-Introduction-to-Spreadsheet-com

20. Priority Matrix

Priority Matrix construction project management software

  • Offers priority management software that provides a wide range of templates which includes a construction project management template.
  • It is designed to help you run your construction projects smoothly and efficiently.
  • You can use the software to assign tasks to your team, coordinate your team and track their progress.
  • It can support you from your kick-off meeting through to final inspections and all important tasks in between.
  • The software aids you in creating transparency through sharing project information and avoiding miscommunication.
  • It can assist you in tracking your project progress so that you can see whether you can complete it on time and within budget.
  • You can streamline your processes and projects through efficient task assignments and tracking.
  • It can also support you in carrying out procurement, quality checks, managing risks, final checks and project handover.
  • The software provides the ability to analyze your data and monitor performance so that you can report on progress to your stakeholders and clients.
  • A free plan is available for personal projects or light use with up to five teammates and up to five projects, and they also offer a 14-day free trial of the software.

Website: https://sync.appfluence.com/project_templates/t/construction-project-management-building-and-construction/

21. ProProfs

ProProfs construction project management software

  • Offers construction project management software that can aid you in delivering your projects on schedule and within budget.
  • It is designed to help you coordinate and track your construction projects and provide you with insight into your projects.
  • The software can help you manage your roles and tasks using workflows to channel your work.
  • It can aid you in bridging communication gaps by providing a single platform with shared information and collaboration support.
  • You can manage your day-to-day tasks and resources whilst providing transparency to your teams.
  • The software can aid you in anticipating and mitigating risks so that you can put things right.
  • You can create task dependencies to enable you to monitor progress and see where there is reliance on other tasks.
  • The software can also track time and costs to assist you in monitoring your budget spend in real-time.
  • You can access smart reports to understand what is happening on your projects and aid you with decision making.
  • They offer a free plan for up to five users with premium features and they also offer a 14-day free trial.

Website: https://www.proprofsproject.com/teams/construction-project-management-software/

22. Ganttic

Ganttic construction project management software

  • They offer construction management software that can assist you in managing multiple job sites and projects smoothly.
  • It is designed to assist you in managing your sites, coordinating your crews and tracking your equipment to improve efficiency.
  • They support your whole project lifecycle so that you can optimize your crew and equipment ensuring maximum utilization.
  • It helps you to track and schedule your crew, monitor equipment usage and schedule maintenance effectively to avoid downtime.
  • You can provide all your team with access to the plans and give them tailored versions to meet their needs.
  • The software allows you to customize data fields so you can record the data you require and report on it.
  • It supports you in organizing your projects, monitoring their status, seeing site details, assigning tasks based on skillsets, and monitoring subcontractor costs.
  • The software also features custom groupings, aids with preventing conflicts and delays, and can produce Gantt charts.
  • You can access reports and dynamic timelines to enable you to adapt to changes and plans using real-time information.
  • They offer a free plan that includes up to 10 resources, and you can also access a 14-day free trial that includes unlimited resources.

Website: https://www.ganttic.com/construction-resource-management-software

23. Planisware

Planisware construction project management software

  • Offers project management software that is tailored for engineering and contruction which can handle complex projects.
  • It is designed to make simpler for you to control your projects and your teams to access accurate project information.
  • The software can combine contracts, documents, schedules and financial information all in one place.
  • It can support you in making decisions as you have all your information together and more visible as your contracts and projects are combined.
  • You can generate contracts quickly using the project proposals in the software.
  • It can track project progress effectively against your deliverables and milestones as well as monitor your budget.
  • You can view projects in different ways including interactive Gantt charts, Kanban boards, to-do lists and more.
  • The software can aid you in factoring the impact of changes and how that might affect your profit margins.
  • It provides reporting and forecasting facilities with real-time analytics so you can monitor performance and resources.
  • You can access 14-day free trial of the software to learn more about it.

Website: https://planisware.com/project-controls-and-engineering

24. Linkd

Linkd construction project management software

  • Offers project management software that is specifically designed for the construction industry to aid with maximizing productivity and keeping projects on track.
  • The software can support multiple projects with many vendors and files and eases the process by bringing everything into a single platform.
  • It aids you and your team in working collaboratively through a single platform with real-time data and remote access.
  • You can automate your workflows to make your processes more efficient and increase productivity.
  • The software enables you to add tasks and milestones that can be monitored and you can attach documents to support them.
  • It can also incorporate an email repository so that all your project information is stored together.
  • The project dashboard makes it easy to track progress as it displays a timeline with project updates, to-do lists and file revisions.
  • They provide the facilities for file sharing and e-signing to support your work with clients.
  • The software can be accessed via a desktop, tablet or smartphone so that you can stay connected on-site.
  • No pricing information is available, however, they claim to provide a cost-effective project management solution.

Website: https://wireflare.com/linkd/

25. Orangescrum

Orangescrum construction project management software

  • They offer an end-to-end construction project management system to streamline your projects.
  • It can aid you in managing project planning, scheduling, site management and inspections with complete audit control.
  • The software can assist you in setting milestones, managing your timelines and allocating resources.
  • You can view your project progress in Gantt charts and Kanban boards so you can see what is happening and keep your projects on track.
  • It can aid you in managing your quality and regulatory management including inspections, compliance with industry regulations and maintaining quality control.
  • The software can also help you to simplify vendor and contractor management as it can aid with communication, performance tracking and contract management.
  • They offer a range of construction project templates to support you and save time.
  • It enables you to review your projects and monitor performance so that you can make informed decisions.
  • You can connect the software with your existing ecosystem to create greater efficiencies.
  • A free plan is available for one user and up to three projects and they also offer a free 15-day trial on their paid plans.

Website: https://www.orangescrum.com/solutions/construction-project-management-software

26. OpenProject

OpenProjects construction project management software

  • Offers construction project management software that aids with efficiently planning and managing building projects.
  • Their software is designed to assist you in planning, communicating and collaborating more effectively.
  • It can support your project initiation during the creation and planning stages including storing and managing all your documents and recommendations in one place.
  • The software can assist you in defining your project scope, planning your time, costs and resources as well as creating risk management.
  • You can track and manage your project budgets as well as track time and costs so that you can create billing reports.
  • They provide a status dashboard to monitor your progress and access information on your projects quickly.
  • It can also manage and track issues and defects on your sites so that you can monitor, prioritize and allocate them to team members.
  • The software also supports the project closure procedures in producing the required documentation and reports.
  • You can access project information easily and create transparency so that your team feel involved and managers are empowered to make decisions.
  • They offer a free plan on their Community that has no minimum users but support is provided by the community only, and they also offer a 14-day free trial of the paid plans.

Website: https://www.openproject.org/bim-project-management/

27. Fieldwire

Fieldwire construction project management software

  • They offer jobsite management for construction teams which is an all-in-one tool.
  • It is designed as a centralized place for your project information and for team members to collaborate.
  • The software helps you to align your field and office through the sharing of a single system which can be accessed by all through any device.
  • It can aid you in assigning tasks to your team so the right people are working on the jobs.
  • You can create schedules for your work and track the performance of that work.
  • The software can be shared with your contractors and partners so that you can share documents and collaborate with them more effectively.
  • It enables you to capture work performed on the job site straight away so that your information is accurate and can reduce risk.
  • You can streamline your processes and documentation through the software to create efficiencies.
  • It also provides real-time messaging, tracking facilities for tasks and inspections, and you can create scheduled reports on your projects.
  • A free plan is available for small teams that want to try out the core features of the software.

Website: https://www.fieldwire.com/

28. Fluix

Fluix construction project management software

  • Offers construction field management software to aid you in automating and digitizing your projects.
  • It is designed to support construction companies in managing projects and tasks as well as managing field inspections.
  • The software can assist you in automating your workflows to create efficiencies and increase control of your processes.
  • You can manage every stage of your construction lifecycle and support activities such as assigning tasks, centralizing document control, collecting approval signatures and distributing toolbox talks.
  • It enables you to manage tasks including organizing their workflow, assigning them to people, setting deadlines and priorities, and viewing progress.
  • The software can enhance team collaboration as you can work on documents in real-time, control document distribution and communicate with others on actions and deadlines.
  • You can share documents with others and request document signatures which can be tracked.
  • They provide flexible reporting facilities with advanced analytics so you can access real-time insights and key metrics.
  • It can be integrated with other tools and apps to help synchronize your data and unify communications.
  • You can book a demo of the software so that you can see first-hand what it can offer.

Website: https://fluix.io/industry-construction

29. Buildertrend

Buildertrend construction project management software

  • They offer construction project management software that can keep your projects on time and within budget.
  • It is designed to help you stay organized, improve collaboration and increase your productivity.
  • The software can assist you in scheduling jobs and keeping your work on track by enabling you to make adjustments as you go along to manage your project timeline.
  • You can create daily logs that document your progress with photos, information and weather updates that can support team members, subcontractors and clients.
  • It allows you to assign tasks and create checklists that can be shared with your team and subcontractors as well as set up automated reminders.
  • You can track your team’s time using a time clock on their phones to enable them to clock in and out of job sites which can support your payroll.
  • The software can improve communications with your team, subcontractors and clients by delivering daily progress updates, sending notification reminders and electronic approvals.
  • It can support you in allocating your resources more effectively, streamlining your processes and enhancing your document control.
  • They offer an integrations marketplace which enables you to connect the software with other key software such as Google Suite, Outlook, iCal and DropBox.
  • They provide real-time reporting to enable you to get valuable insight into your project performance and aid decision making.

Website: https://buildertrend.com/project-management/

30. Procore

Procore construction project management software

  • Offers construction project management software that can help you deliver on schedule and budget.
  • The centralized platform brings together your project information teams so everyone is more informed.
  • They provide mobile collaboration tools to support your field-based team members in accessing information.
  • It enables you to have greater visibility of your projects and identify any potential issues.
  • You can track all your project steps in tasks and make approval processes quicker.
  • The software integrates scheduling facilities so that you can manage your projects and staffing more effectively.
  • You can store and manage your project documents, drawings and photos on the platform so that all your project information is in one place.
  • It also includes daily logs, punch lists, timecards, correspondence and email management.
  • They provide reporting that can give you insights into your projects and aid you in analyzing every detail.
  • You can request a demo of the software so that you can learn more about it.

Website: https://www.procore.com/project-management

31. Striven

Striven construction project management software

  • They offer construction management software to support construction and contracting companies.
  • It is an all-in-one solution offering project management, accounting, HR and recruiting, materials and inventory, scheduling and tracking, and office productivity.
  • They provide real-time collaboration tools that enable you to work with your team on planning through to the completion of jobs.
  • It is a centralized system that keeps your data on your work up to date for all your teams regardless of where they are including in the field with the mobile app.
  • You can organize your team, allocate your resources and increase your profitability through the software.
  • It supports you in planning and scheduling including creating workflows, setting dates and milestones, setting and tracking your budgets, sharing and storing data and documents.
  • You can assign tasks and monitor their progress using due dates, smart labels and alerts.
  • The software allows you to display your projects in Gantt charts, Kanban boards or lists.
  • It enables you to create reports that can monitor your project performance, profitability and milestones.
  • They offer a free plan for up to 100 customers, vendors and applications per month, as well as offering a 7-day free trial of the software.

Website: https://www.striven.com/solutions/industry/construction-management-software

Switch On Business

Copyright © 2026 SwitchOnBusiness.com

Mailing Address:
Switch On Business
1178 Broadway, 3rd Floor #3166
New York, NY
10001
United States

Content is for informational purposes and is not legal or financial advice. All information was accurate at the time of publication but may have since changed.

Disclosure: Our content is reader-supported. This means if you click on some of our links, then we may earn a commission. Our team is committed to delivering honest, objective, and independent reviews all business products and services.

Please check our Privacy Policy page for more


Project Management Software

  • Home
  • About
  • Privacy Policy
  • Contact Us
  • Business Stats